Showing posts with label drunkard's path. Show all posts
Showing posts with label drunkard's path. Show all posts

Thursday, April 2, 2020

The Drunk Wool Quilt | Day 8

This might be the slowest quilt in the history of the world. I finished the top in 2012. I basted it July 2019. Discovered that with batting, it was too thick to quilt. April 2020, lockdownlevelfour-time, I was excited to un-baste it and re-baste it with just a flannel backing. I love having hand sewing on the go. It's nice being able to sit in the afternoon with a bit of Netflix to slow quilt. Hopefully, the pink thread will get me through the 16 circles.





And here's today's word from the other project I have on the go -


Saturday, September 7, 2019

When things don't go to plan

Back at the end of July I basted my drunkard's path wool quilt. I made it in 2012.


Then I started quilting and that's when things didn't go plan. The quilt is too thick to quilt. The stitches are hideous.


It's been sitting in the corner of the lounge waiting to be unbasted. What a waste of time! I am going to back it with flannel and have no batting.


The house fix is also not going to plan. It's week 16 of a 12 week project. 16 weeks ago the constant rain cost a few days, but most recently the discovery of asbestos in the glue of some old lino tiles held progress up by at least 10 days, and added another $9500 to the bill! I did suggest we just put something over the floor, but there were so many layers already, apparently this was not an option. In addition to the three floor coverings in the photos below, there were white ceramic tiles and most recently, faux wood lino tiles/strips.The floor had to be razor scraped and then ground back. This all happened after the room had been plastic sealed and negative air pressure created. It took less than two days to do the actual work, but then it had to be tested each day to check for random fibres.





Fortunately, work started again mid week, and the kitchen and laundry installation began. (It's week six without a kitchen or laundry.) The tiler is supposed to start on Monday (the wrong tiles were delivered at some stage too) and the drain layer is back later in the week to continue his work outside.


Three weeks until the holidays. Yay! I cannot wait for this fix to be over.

Sunday, March 11, 2012

Wool Quilt



The back
I think I started this quilt in 2008 - I remember starting it even though I was still working on my big sampler quilt and I worked on that from 2007 - 2009.

I felt like sewing yesterday, so pulled the quarters off the shelf and got them all sewed up. It only took about 3 hours ... after 4 years of sitting one quarter made. It was the most productive part of my Saturday.

It's made from two old woollen blankets I got from Mum's linen cupboard. I think the print is a Moda 3 Sisters one. I really fancied a pretty pink and green quilt at the time. I do still like it. Maybe I will use it this winter. It measures 70 x 70 inches, just over 1.7m square.

I am not sure what to use for batting given it's wool already. No hurry to decide. It might be an April school holiday decision.